Great Southern Rail Trail Projects
Share Great Southern Rail Trail Projects on Facebook
Share Great Southern Rail Trail Projects on X (formerly Twitter)
Share Great Southern Rail Trail Projects on Linkedin
Email Great Southern Rail Trail Projects link
The Great Southern Rail Trail Projects include the:
- Leongatha to Korumburra link
- Korumburra to Nyora extension and beyond
- Welshpool to Alberton link
Since the complete closure of the rail line between Dandenong and Port Albert in 1994 various sections have been developed into a rail trail. At present the Great Southern Rail Trail stretches 71 kilometres from Leongatha to Port Welshpool. The trail is an important contributor to the local and regional economy, attracting a large number of tourists.
